Activity Description

Repair and refurbishment of various types of generator rotors and ( steam & gas) turbine rotors .
Overhaul and installation of steam, gas & hydro electric powerplant .
Overhaul, refurbishment and installation of various types of power transformers, electro motors and generators .

IPRCo Projects Samples

Repair and H.S Balance of LMZ LP and IP Turbine Rotors #5 of AHWAZ Electric Power Generation Management Co.

AHWAZ POWER GENERATION MANAGEMENT CO. 1389 / 2011

To measure Run out, Sand blasting, Visual inspection, Substitute of blades, welding of damping wires, High Speed Balancing.

1

Repair of FRANCO TOSI HIP and LP Turbine Rotor #3 of HORMOZGAN Electric Power Generation Management Co

………………………………………………………………………………………………………………………….

HORMOZGAN POWER GENERATION MANAGEMENT CO 1388 / 2010

Measure Run-Out, Sand blasting ,NDT, Substitute of blades, Welding of tenons, High speed balance.

2

Repair of FRANCO TOSI Spare Generator Rotor of HORMOZGAN Electric Power Generation Management Co

………………………………………………………………………………………………………………………….

HORMOZGAN POWER GENERATION MANAGEMENT CO. 1388 / 2010

Measuring Run-Out, NDT, Winding and Rewinding, Electrical tests, High speed balance

3

Repair of WESTINGHOUSE W191 Gas Turbine Rotor of RAZI Petrochemical Complex

………………………………………………………………………………………………………………………….

Repair of WESTINGHOUSE W191 Gas Turbine Rotor of RAZI Petrochemical Complex

 

RAZI Petrochemical Complex‏ ۱۳۸۷ / ۲۰۰۹

 

Measuring Run-Out, Sand blasting, NDT, Inspection and repair of rotor, Assemble and disassemble of the disks, High speed balance.

 

 

Repair and Refurbishment of GE Generator Rotor #2 of MONTAZER QA’EM Electric Power Generation Management Co

 

MONTAZER QA’EM POWER GENERATION MANAGEMENT CO. 1384 / 2005

 

Measuring Run-Out, NDT, Winding and Rewinding, Electrical tests, High speed balance.

4

………………………………………………………………………………………………………………………….

Repair of SIEMENS Generator Rotor #21 of GILAN Electric Power Generation Management Co

 

GILAN ELECTRIC POWER GENERATION MANAGEMENT C. 1383 / 2003

 

Measuring Run-Out, NDT, Winding and Rewinding, Electrical tests, High speed balance

5

………………………………………………………………………………………………………………………….

Repair of FRANCO TOSI HP, IP, LP Turbine Rotors #2 of HORMOZGAN Electric Generation Management Co

 

HORMOZGAN POWER GENERATION MANAGEMENT CO. 1389 / 2011

 

Measuring Run-Out, Cleaning blades and body with sand blast process, Repair welding on the tenons and produce shrouds like primary types with the same material. High Speed Balance

6

………………………………………………………………………………………………………………………….

Repair of two LMZ steam Turbine Rotors #3 of ESFAHAN Steel Co

ESFAHAN Steel Cc. 1390 / 2011

 

Measuring Run out, NDT, Sand blasting, Re blade, High speed balance

Repair of SKODA Steam Turbine and Generator Rotors #2 of SISTAN BALUCHESTAN Electric Power Generation Management Co

 

SISTAN BALUCHESTAN Regional Electric Co.‏ ۱۳۹۰ / ۲۰۱۱

 

Measuring Run out, NDT, Sand Blasting, Stress Relief Heat Treatment, Thermal Straightening, Machining of journal bearing, Substitute of Seal Strips, High speed balance.

 

 

Repair of two GE F6 Gas Turbine Rotor of south Pars Gas Complex

 

SOUTH PARS Gas Complex 1388 / 2009

 

Measuring Run out, NDT, Substitute of blades, Assemble and Disassemble disks and tie rods, High speed balance

7…………………………………………………………………………………………………………………………

Repair & Refurbishment of ANSALDO Generator Rotor # 8 of DAMAVAND Electric Power Generation Management Co

 

DAMAWAND POWER GENERATION MANAGEMENT CO. 1388 / 2009

 

Measuring Run-Out, NDT, Winding and Rewinding, Electrical tests, High speed balance.

8

………………………………………………………………………………………………………………………….

Rewinding of MITSUBISHI Generator Rotor # 34 of REY Electric Power Generation Management Co

 

REY ELECTRIC POWER GENERATION MANAGEMENT CO. 1388 / 2009

 

Measuring Run-Out, NDT, Winding and Rewinding, Electrical tests, High speed balance.

9

………………………………………………………………………………………………………………………….

Repair & Refurbishment of SIEMENS Generator rotor of MONTAZER QA’EM Power plant

 

MONTAZERQAEM POWER GENERATION MANAGEMENT CO. 1387 / 2008

 

Measuring Run out, Welding of journal bearing, Heat treatment, Winding and Rewinding, NDT, Electrical tests, High speed balance.

 

 

Overhaul of WESTINGHOUSE W101 Gas Turbine Rotor of HASHEMI NEJHAD Gas Complex

 

HASHEMI NEJHAD Gas Complex 1386 / 2007

 

Measuring Run out, Sand blasting, NDT, Assemble & Disassemble of the disks, Inspection of root of blades in NDT way, High speed balance

10

………………………………………………………………………………………………………………………….

Overhaul of two MITSUBISHI gas Turbine Rotors of SOUTH PARS Power Generation Management

 

SOUTH PARS POWER GENERATION MANAGEMENT CO. 1384 / 2006

 

Measuring Run out, Sand blasting, NDT, Inspection and repair of rotor, Assemble and disassemble of the disks, High speed balance.

 

 

Repair of 10 set GE-F5 and 6 set WESTINGHOUSE Turbine Rotors of TAVANIR Co.

 

TAVANIR CO. 1382 / 2004

 

Measuring Run out, Sand blasting, NDT, Re blade Turbine and Compressor stages, Disassemble and assemble compressor and turbine tie rods, High speed balance.

11

………………………………………………………………………………………………………………………….

 

Overhaul & Refurbishment of MITSUBISHI Turbine Rotor of Unit G13 of QOM Power plant

 

QOM ELECTRIC POWER GENERATION MANAGEMENT CO.

 

Measuring Run out, Sand blasting, NDT, Inspection and repair of rotor, assemble and disassemble of the disks, High speed balance.

 

 

Repair of BBC Generator Rotor #2 of NEKA Power plant

 

TAVANIR CO. 1382 / 2003

 

Measuring Run out, NDT, Thermal Straightening, Stress relief Heat treatment, High speed balance

………………………………………………………………………………………………………………………….

Repair of BBC Generator Rotor #2 of NEKA Power plant

 

TAVANIR CO. 1382 / 2003

 

Measuring Run out, NDT, Thermal Straightening, Stress relief Heat treatment, High speed balance

13

………………………………………………………………………………………………………………………….

Repair and straightening of DONFENG HIP turbine rotor of SHAZAND Electric Power generation management

 

SHAZAND POWER GENERATION MANAGEMENT CO. 1385 / 2007

 

Measuring Run out, Sand blasting, Perform NDT, Thermal straightening and stress relief of the rotor, Install new seal strips, High speed balance.

14

………………………………………………………………………………………………………………………….

Manufacture of new one GE F9 Generator Rotor for a gas unit of SHAHID RAJAEE Electric Power generation

 

SHAHID RAJAEE ELECTRIC POWER GENERATION MANAGEMENT CO. 1385 / 2007

 

Manufacturing of rotor body, Winding, Measuring Run out, NDT, Electrical tests, High speed balance.

15